SA Power Networks

The Project: Marion Road/Anzac Highway/Cross Road Electrical Relocation.

When: Mid 2024 – early 2025.

The Scope: Installation of new electrical pit and conduit infrastructure and stobie pole footings for the relocation of overhead powerlines to underground.

The Highlights:

  • Multi-way directional bores up to 10 x 125mm conduits.
  • 2 x Multi-way Tram line undertrack directional bores.
  • Stobie pole footings up to 3.8m deep.
  • Multi conduit trench runs up to 10 x 100mm conduits.
  • 10 x 125mm directional bore across Anzac Highway.
  • Reinstatement to DIT specifications.
  • High traffic intersections.