The Project: Marion Road/Anzac Highway/Cross Road Electrical Relocation.
When: Mid 2024 – early 2025.
The Scope: Installation of new electrical pit and conduit infrastructure and stobie pole footings for the relocation of overhead powerlines to underground.
The Highlights:
- Multi-way directional bores up to 10 x 125mm conduits.
- 2 x Multi-way Tram line undertrack directional bores.
- Stobie pole footings up to 3.8m deep.
- Multi conduit trench runs up to 10 x 100mm conduits.
- 10 x 125mm directional bore across Anzac Highway.
- Reinstatement to DIT specifications.
- High traffic intersections.