The Project: Tailem Bend – River Bore – Jervois Primary School Connection.
When: 2021.
The Scope: Installation of new communications conduit and cabling to Jervois Primary School
included directional bore across the River Murray.
The Highlights:
- 320m bore across body of water for 110mm communications conduit.
- Drill tracking via boat.
- River survey and bore design.
- Fibre optic cable installation and splicing.
- 1km of external build to support river bore.







