Telstra

The Project: Tailem Bend – River Bore – Jervois Primary School Connection.

When: 2021.

The Scope: Installation of new communications conduit and cabling to Jervois Primary School
included directional bore across the River Murray.

The Highlights:

  • 320m bore across body of water for 110mm communications conduit.
  • Drill tracking via boat.
  • River survey and bore design.
  • Fibre optic cable installation and splicing.
  • 1km of external build to support river bore.