SA Water

The Project: Hahndorf WWTP.

When: July 2025.

The Scope: Installation of new water line via directional boring.

The Highlights:

  • Directional boring in hard rock
  • 530m of 110mm lilac conduit
  • Pressure testing
  • Poly welding to SA Water standards
  • Difficult terrain
  • Construction of access tracks