The Project: Hahndorf WWTP.
When: July 2025.
The Scope: Installation of new water line via directional boring.
The Highlights:
- Directional boring in hard rock
- 530m of 110mm lilac conduit
- Pressure testing
- Poly welding to SA Water standards
- Difficult terrain
- Construction of access tracks












