The Project: Augusta Highway Moisture barrier trials.
When: June 2023 – July 2024.
The Scope: Installation of protective moisture barrier alongside the Augusta Highway.
The Highlights:
- 16,500m of chain trenching.
- Trench depth of 2m.
- On site batching plant.
- Over 7000 cubic meters of cement stabilised sand backfill.







