McConnell Dowell Diona JV

The Project: Main South Road Duplication – Fleurieu connections.

When: September 2024 – March 2025.

The Scope: Installation of new sewer main, water main and local services via directional boring.

The Highlights:

  • 145m directional bore for 355mm cream stripe sewer.
  • 145m directional bore for 280mm cream stripe sewer.
  • 18 x 50-60m 110mm directional bores for water services.
  • Poly welding to SA Water standards.