The Project: Main South Road Duplication – Fleurieu connections.
When: September 2024 – March 2025.
The Scope: Installation of new sewer main, water main and local services via directional boring.
The Highlights:
- 145m directional bore for 355mm cream stripe sewer.
- 145m directional bore for 280mm cream stripe sewer.
- 18 x 50-60m 110mm directional bores for water services.
- Poly welding to SA Water standards.