Niramar Electrical

The Project: St Peters College electrical capacity upgrade.

When: Dec 2023 – March 2024.

The Scope: Installation of new electrical infrastructure for electrical capacity expansion.

The Highlights:

  • 200m 6 way directional bore across the school oval ensuring minimal disruption to turf.
  • Installation of large gatic pits throughout the school.
  • Construction of in-situ concrete switchboard plinths.
  • Trenching and installation of electrical conduits up to 150mm diameter at various locations.
  • Survey of existing underground services and GPS surveyed as constructed documentation.
  • Breakout and reinstatement of various surfaces.