The Project: St Peters College electrical capacity upgrade.
When: Dec 2023 – March 2024.
The Scope: Installation of new electrical infrastructure for electrical capacity expansion.
The Highlights:
- 200m 6 way directional bore across the school oval ensuring minimal disruption to turf.
- Installation of large gatic pits throughout the school.
- Construction of in-situ concrete switchboard plinths.
- Trenching and installation of electrical conduits up to 150mm diameter at various locations.
- Survey of existing underground services and GPS surveyed as constructed documentation.
- Breakout and reinstatement of various surfaces.