The Project: Majors Road Interchange.
When: December 2023 – July 2025.
The Scope: Common service trenching, road lighting and traffic signalling infrastructure.
The Highlights:
- 2000m of common services trenching including conduits for SAPN, Telstra, Optus, Vocus and DIT.
- CST’s ranging from 2 to 24 conduits.
- Traffic signalling installation at 2 x major intersections.
- 82 x DIT light poles.
- 1500m of road lighting conduit installed.
- 152 x DIT lighting, ITS and traffic signal pits installed.
- 33 x traffic signal pole footings installed.
- Various switchboard and signal controller concrete plinths.